You don't have javascript enabled. Good luck with that.
Pencarian
Saluran di Jalan Flamboyan Mulai Dipasang U-dith

Channel Repair on Jl. Flamboyan Kebon Jeruk Has Reached 80 Percent

West Jakarta Water Resources (SDA) Sub-agency is currently repaired water channel on Jl. Flamboyan, Kebon Jeruk, by installing it with U-ditch and covers.

Our target is to complete it by the end of June

West Jakarta SDA Sub-agency Drainage Maintenance Section Head, Wawan Kurniawan mentioned, U-ditch and covers installation work has been carried out since June 12, 2021.  

"U-ditch and channel covers will be installed on channel along 80 meters with width 60 centimeters," he informed, Thursday (6/24).

Channel on Jalan Merpati in Meruya Utara Widened

His side deployed 1 unit mini excavator and 13 personnel equipped with hoes, crowbars, sledgehammers, hammers, and buckets.

"Current progress has reached 80 percent. Our target is to complete it by the end of June," he said.

He hopes this repair can optimize water channel capacity thus it can minimize inundation, especially during heavy rains.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye971 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye932 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye826 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye709 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye606 personAnita Karyati